Our Commitment

At Pinnacle Urja Invest, we are committed to developing hydropower projects that respect and preserve Nepal's natural environment. We follow Nepal's Environmental Protection Rules 1997 and conduct Initial Environmental Examinations (IEE) to minimize impacts on the surrounding ecosystems.

Our approach to sustainability goes beyond regulatory compliance. We believe in creating value through energy that respects nature and uplifts society, ensuring that our projects contribute positively to both the environment and local communities.

Environmental Compliance
Community Engagement
Ecosystem Protection
Sustainable Development
Sustainability

Key Practices

Minimum Flow

Minimum Downstream Flow

We maintain a 10% minimum downstream flow to protect aquatic ecosystems and ensure the river's ecological functions are preserved.

Upstream Projects

Upstream Protection

No basin transfer projects are permitted upstream, ensuring the natural flow of the river system is maintained for ecological balance.

Community Consultations

Community Consultations

We conduct thorough community consultations before construction begins to address concerns and incorporate local knowledge into our planning.

Mitigation Strategy

Impact Mitigation Measure
Aquatic ecosystem disruption Downstream flow release (0.578 m³/s)
Soil erosion Vegetative buffer zones
Local livelihoods Employment during construction
Habitat fragmentation Wildlife corridors and habitat restoration
Water quality Sediment management and monitoring