At Pinnacle Urja Invest, we are committed to developing hydropower projects that respect and preserve Nepal's natural environment. We follow Nepal's Environmental Protection Rules 1997 and conduct Initial Environmental Examinations (IEE) to minimize impacts on the surrounding ecosystems.
Our approach to sustainability goes beyond regulatory compliance. We believe in creating value through energy that respects nature and uplifts society, ensuring that our projects contribute positively to both the environment and local communities.
We maintain a 10% minimum downstream flow to protect aquatic ecosystems and ensure the river's ecological functions are preserved.
No basin transfer projects are permitted upstream, ensuring the natural flow of the river system is maintained for ecological balance.
We conduct thorough community consultations before construction begins to address concerns and incorporate local knowledge into our planning.
Impact | Mitigation Measure |
---|---|
Aquatic ecosystem disruption | Downstream flow release (0.578 m³/s) |
Soil erosion | Vegetative buffer zones |
Local livelihoods | Employment during construction |
Habitat fragmentation | Wildlife corridors and habitat restoration |
Water quality | Sediment management and monitoring |
FAQs